Home Case Histories Hydrocarbon & Chemical

Case Histories

  • {picture_description}

    EDC Craking Furnace

    Emisshield was applied to Incoloy process tubes (serpentine), to the hard refractory sidewalls and ceramic fiber roof.  This application occurred in November 2007.

    More About This Case
  • {picture_description}

    Terrace Wall Ammonia Reformer

    The Ceramic fiber modules coated with Emisshield to protect the modules from shrinking and extend their service temperature.

    More About This Case
  • {picture_description}

    Ethylene Furnace

    Emisshield was applied to the Ethylene Furnace in April 2006. The customer opted for a 6% fuel savings while increasing the production 8%.

    More About This Case
  • {picture_description}

    Ethylene Furnace

    The Emisshield was applied to the ethylene cracker in June of 2005. The customer wanted to evaluate the energy savings associated with the application of the Products.

    More About This Case